Research

Agents

Subscribe to this site

     

Home page // LEAD // STACKING MACHINE

Dross Engineering builds a range of automated lead ingot stacking machines.

Production is directly related to ingot weight as the minimum casting time per ingot is 3 seconds irrespective of ingot weight.

Once the ingots reach the ‘knock-out’ station, at the end of the casting machine, the transfer to the stacker conveyor is automated and they undergo a thickness check, any out of range ingot is ejected.

Options include:

Ingot marking/identification

Bale weighing station & labeling with weight and cast reference

Automated bale strapping